Chess Plaza Opened Today!

Remaining Fences Down!
Among the first Chess Players at newly open Chess Plaza
Path looking South

Well, it took 29 months, but, at last, the Chess Plaza and SW Quadrant – Phase II-B of construction at the Park – has opened today!

It feels smaller and a bit less cozy than before. Well, it IS smaller. The Parks Commissioner Adrian Benepe and I had a bit of a back-and-forth back in February of 2009 about a # of issues related to WSP, including the Chess Plaza being reduced, and he stated the following:

While the overall size of the plaza is being reduced somewhat, the most critical area of the chess plaza is the chess tables, not the center which is generally empty. The renovation will include the same number of tables, but they will be new, better designed and more welcoming to more chess players – and they will be accessible to people with disabilities. There will be plenty of space for onlookers to stand and watch the games. As with the rest of the park, the renovation of the chess area will likely result in greater use, not less.

The difference is that before it didn’t feel so much like a space you just ‘passed through’ which is the feeling now. Things happened in the center which the Parks Commissioner felt was “generally empty” — a space which is now occupied by a flower bed. Perhaps that space that the Parks Commissioner thought was basically useless served a purpose after all?

(Note: Will add in a photo to illustrate!)

At least Phase II is now officially complete! (Of course, parts of the original Phase II moved into Phase III.)

Previously at WSP Blog:

* Washington Square Park Redesign: Phase II

* After 29 Months, Will the Final ‘Piece’ of Washington Square Park Redesign: Phase II Construction – Chess Plaza – Open Tomorrow? March 1, 2012

Spread the love

Leave a Comment

%d bloggers like this: